Pays:
Schweiz / Switzerland
Région: Kanton Tessin / Cantone Ticino
Sous-régione: Bezirk Locarno
Ville: Gambarogno
v4 a3 III
6h1
1h
5h
1min
970m
210m
760m
32m
2x 40m
32
2300m
Voiture facultative
Évaluation:
★★★★★
3.5 (1)
Info:
★★★
2 (1)
Belay:
★★★
2 (1)
Résumé:
pas de traduction disponible
long run in the forest with a nice final canyon
avril - octobre
10-18 Heures
Nord-Ouest
Gneiss
2.70km²
Résumé:
pas de traduction disponible
long run in the forest with a nice final canyon
Accès:
Approche (1 h):
Tour (5 h):
Retour (1 min):
Coordonnées:
Départ du Canyon
46.104696°, 8.792675°
↓↑
DMS: 46° 6" 16.91', 8° 47" 33.63'
DM: 46° 6.282", 8° 47.561"
Google Maps
Suisse Topographique
DMS: 46° 6" 16.91', 8° 47" 33.63'
DM: 46° 6.282", 8° 47.561"
Google Maps
Suisse Topographique
Départ alternatif du Canyon
46.106366°, 8.788897°
↓↑
DMS: 46° 6" 22.92', 8° 47" 20.03'
DM: 46° 6.382", 8° 47.334"
Google Maps
Suisse Topographique
DMS: 46° 6" 22.92', 8° 47" 20.03'
DM: 46° 6.382", 8° 47.334"
Google Maps
Suisse Topographique
Fin du Canyon
46.110528°, 8.768388°
↓↑
DMS: 46° 6" 37.9', 8° 46" 6.2'
DM: 46° 6.632", 8° 46.103"
Google Maps
Suisse Topographique
DMS: 46° 6" 37.9', 8° 46" 6.2'
DM: 46° 6.632", 8° 46.103"
Google Maps
Suisse Topographique
Parking à l'entrée
46.118523°, 8.80085°
↓↑
DMS: 46° 7" 6.68', 8° 48" 3.06'
DM: 46° 7.111", 8° 48.051"
Google Maps
Suisse Topographique
DMS: 46° 7" 6.68', 8° 48" 3.06'
DM: 46° 7.111", 8° 48.051"
Google Maps
Suisse Topographique
Parking à la sortie
46.11016°, 8.767319°
↓↑
DMS: 46° 6" 36.58', 8° 46" 2.35'
DM: 46° 6.61", 8° 46.039"
Google Maps
Suisse Topographique
DMS: 46° 6" 36.58', 8° 46" 2.35'
DM: 46° 6.61", 8° 46.039"
Google Maps
Suisse Topographique
05.10.2025
Massimo Loriato
⭐
★★★★★
📖
★★★
⚓
★★★
💧
Normale
Terminé ✔
pas de traduction disponible
D'autres utilisateurs ont été: Peter
Completed the exploration, started in 2023 with the upper part and 2024 with the intermediate part, with the last section from Caviano/Sant'Abbondio at height 290 down to parking under the road just before the lake at height 210.
Flow in picture medium, no rain in the last week but quite all day in the week before, that makes the last section very nice cause starting with a 20m high pitch followed by a narrower passage with a couple more pitches with abundant water.
D'autres utilisateurs ont été: Peter
Hydrologie: