Country:
Shqipëria / Albania
Region: Shqipëria e Mesme
Subregion: Qarku i Elbasanit
Town: Elbasani / Elbasan
v4 a4 III
2h45
0min
2h30
15min
480m
200m
280m
29m
2x35m
2500m
Car required
Rating:
★★★★★
3.4 (3)
Info:
★★★
2 (1)
Belay:
★★★
2 (3)
Summary:
machine translated
➜
Original language
Schöner, leider zugemüllter Canyon,.
Beautiful, unfortunately littered canyon.
Summary:
machine translated
➜
Original language
Schöner, leider zugemüllter Canyon,.
Beautiful, unfortunately littered canyon.
Access:
Approach (0 min):
Tour (2 h 30):
Return (15 min):
Coordinates:
Canyon End
41.15344°, 20.156666°
↓↑
DMS: 41° 9" 12.38', 20° 9" 24'
DM: 41° 9.206", 20° 9.4" Google Maps OpenStreetMap Komoot Mapy.cz
DMS: 41° 9" 12.38', 20° 9" 24'
DM: 41° 9.206", 20° 9.4" Google Maps OpenStreetMap Komoot Mapy.cz
Canyon Start
41.164958°, 20.144847°
↓↑
DMS: 41° 9" 53.85', 20° 8" 41.45'
DM: 41° 9.897", 20° 8.691" Google Maps OpenStreetMap Komoot Mapy.cz
DMS: 41° 9" 53.85', 20° 8" 41.45'
DM: 41° 9.897", 20° 8.691" Google Maps OpenStreetMap Komoot Mapy.cz
Parking at Entry
41.164703°, 20.144863°
↓↑
DMS: 41° 9" 52.93', 20° 8" 41.51'
DM: 41° 9.882", 20° 8.692" Google Maps OpenStreetMap Komoot Mapy.cz
DMS: 41° 9" 52.93', 20° 8" 41.51'
DM: 41° 9.882", 20° 8.692" Google Maps OpenStreetMap Komoot Mapy.cz
Trip Report (e.g. Blogpost)
30.04.2026
Joey CIA
⭐
★★★★★
📖
★★★
⚓
★★★
💧
Normal
Completed ✔
machine translated
➜
Original language
Other users were: Wolfgang Held Stoffl
Ganz nett, wenn der viele Müll vorallem im Anfangsbereich 45 min Blockkletterei nicht wäre. Coole Abseiler. Letzter hoher Abseiler aber eher 36m statt 29m .Stände alle Ok.
Quite nice, if it weren't for all the garbage, especially in the initial 45 minutes of block climbing. Cool rappels. Last high rappel but rather 36m instead of 29m, all stands ok.
Other users were: Wolfgang Held Stoffl
30.03.2026
Sebastian Gruber
⭐
★★★★★
📖
★★★
⚓
★★★
💧
High
Completed ✔
machine translated
➜
Original language
Beim Siphon haben wir eine Umgehung orographisch links eingerichtet, da dieser zu fiel Wasser hatte. Der hohe Wasserfall kann links umgangen werden. Die Verankerung der Wasserleitung kann zum Abseilen verwendet werden.
At the siphon we have set up a bypass on the left, as it had too much water. The high waterfall can be bypassed on the left. The anchoring of the water pipe can be used for rappel.
22.06.2024
Bina
⭐
★★★★★
📖
★★★
⚓
★★★
💧
Normal
Completed ✔
machine translated
➜
Original language
Other users were: Patrik Bartel
Leider viel zu viel Müll in der Schlucht.
Unfortunately, far too much garbage in the canyon.
Other users were: Patrik Bartel
Hydrology: