v4 a2 III
3h16
1min
3h
15min
1670m
1420m
250m
32m
2x 40m
14
650m
Car optional
Rating:
★★★★★
0 ()
Info:
★★★
0 ()
Belay:
★★★
0 ()
Summary:
Beautiful series of waterfalls in red rock and an open alpine environment.
May - October
10-18 o'clock
Northeast
Gneiss
3.30km²
Summary:
Beautiful series of waterfalls in red rock and an open alpine environment.
Access:
• Downstream: coming from Paisco, follow SP294 towards Passo del Vivione; after two wide hairpins, a small clearing on the left allows parking near an old ENEL building, just before the bridge over the Allione River; around 1400 m (46°02'58.3"N 10°13'28.7"E).
• Upstream: with the second car, continue towards the pass up to about 1670 m, where just before a sign reading 'Danger: free-roaming livestock' you can park in a small clearing on the left (46°02'33.6"N 10°13'19.7"E).
Approach (1 min):
• With shuttle: from the upper parking lot, continue briefly on the paved road to find a convenient point to descend to the stream (46°02'43.8"N 10°13'34.8"E). 1 minute.
• Without shuttle: without a shuttle, you need to climb the paved road up to the upper parking lot; 270 m ascent.
Tour (3 h):
01- C10 (nat sx)
02- C8 (nat sx)
03- C28 (nat sx)
04- C21 (1 sx)
05- C18 (2 dx)
06- C20 (2 sx)
07- C32 (2 centrali)
08- C15 (nat sx)
09- C10 (nat dx)
10- C15 (2 sx)
11- C25 (nat sx)
12- C8 (1 dx)
13- C8+5 (1 sx)
14- C20 (2 dx)
Return (15 min):
Upon reaching the intake (46°02'31.3"N 10°13'19.3"E), follow the easy service road to the main road and the cars. Be careful at the Allione intake not to end up inside the ENEL enclosure. About 10–15 minutes; 20 m descent.
Coordinates:
Canyon Start
46.042012°, 10.222043°
↓↑
DMS: 46° 2" 31.24', 10° 13" 19.36'
DM: 46° 2.521", 10° 13.323"
Google Maps
DMS: 46° 2" 31.24', 10° 13" 19.36'
DM: 46° 2.521", 10° 13.323"
Google Maps
Canyon End
Parking at Exit
46.049545°, 10.224561°
↓↑
DMS: 46° 2" 58.36', 10° 13" 28.42'
DM: 46° 2.973", 10° 13.474"
Google Maps
DMS: 46° 2" 58.36', 10° 13" 28.42'
DM: 46° 2.973", 10° 13.474"
Google Maps
Parking at Entry
Hydrology:
Flow assessment: from the road just before the lower parking lot (binoculars useful) or at the entrance.v