difficile
Ticinetto (Inferiore)
Paese:
Schweiz / Switzerland
Regione: Kanton Tessin / Cantone Ticino
Sottoregione: Bezirk Leventina
Città: Chironico
v5 a5 III
2h30
5min
2h
25min
775m
605m
170m
32m
2x 40m
8
300m
a piedi
Specialità:
Diga § Divieto
Diga § Divieto
Valutazione:
★★★★★
3.6 (1)
Info:
★★★
2 (1)
Belay:
★★★
0 ()
Sintesi:
traduzione alternativa
➜
Lingua originale
Wasserreicher und kurzer Abseilcanyon unterhalb eines Stauseees
Watery and short rappel canyon below a reservoir
Parti
Nome
Difficoltà
Avvicinamento
Giro
Ritorno
giugno - ottobre
9-16 Ore
Sud-Est
Gneiss
Sintesi:
traduzione alternativa
➜
Lingua originale
Wasserreicher und kurzer Abseilcanyon unterhalb eines Stauseees
Watery and short rappel canyon below a reservoir
Accesso:
traduzione alternativa
➜
Lingua originale
Von Biasca auf der Bundesstraße etwa 13 km in Richtung Nord-Ost (Gotthard). Gut 5 km nach Durchfahren der Ortschaft Giornico links abbiegen und in westlicher Richtung hinauf nach Chironico. Am Ortseingang (auf der oben genannten CNS Karte bei der Höhenangabe "787") nehmen wir die links abgehende Straße, die uns in einem weiten Bogen an die Südseite der Ortschaft Chironico führt. Hier stellen wir rechts unterhalb der Straße das Auto auf dem Parkplatz ab.
From Biasca on the main road for about 13 km in north-east direction (Gotthard). A good 5 km after passing through the village of Giornico, turn left and head west up to Chironico. At the entrance of the village (on the above mentioned CNS map at the altitude "787") we take the road on the left that leads us in a wide curve to the south side of the village of Chironico. Here we park the car in the parking lot on the right, below the road.
Avvicinamento (5 min):
traduzione alternativa
➜
Lingua originale
Vom Parkplatz auf der Straße in südöstlicher Richtung - am kleinen Stausee entlang - zum Staudamm mit Betriebshaus, links an diesem vorbei und dann in einem Rechtsbogen hinunter an das Gerinne. Zustieg unmittelbar am waagrecht herausschießenden Wasserstrahl mit einem 7-m-Sprung möglich.
From the parking lot on the road in a southeasterly direction - along the small reservoir - to the dam with company house, passing it on the left and then in a right turn down to the channel. Access directly at the horizontally shooting out water jet with a 7 m jump possible.
Giro (2 h):
traduzione alternativa
➜
Lingua originale
Ziemlich zu Beginn bietet sich kernige eine 22 m - Rutsche an. Direkt danach li. Ausstiegsmöglichkeit. Nach Nizzola beginnt hier "the descent into hell". Die Schwierigkeit ergibt sich aus dem Umstand, dass man nach dem Hineinseilen in die Engstelle in der Wassergischt einenen Handlauf einrichten muss und der folgende 30-m-Abseiler im unteren Bereich in eine Rinne (mit vollem Wasserdruck) führt, aus der man sich tunlichst heraushalten sollte (Pendelgrätsche).
Der Ticinetto gehört trotz seiner geringen Länge zu den sportlich wie landschaftlich sehr attraktiven Canyons des Tessin. Wasserableitung mit kleinem Staubecken oberhalb des Einstiegs. Vor und nach(!)der Tour deshalb mit Kraftwerksbetreiber (SES) Kontakt aufnehmen: Tel. 0041(0)917569301
Hinsichtlich der Wassermenge auch den Überlauf aus dem Staubecken beachten! (insofern irrt Nizzola, wenn er nur auf den Gumpen nach der Spundwand abstellt).
Right at the beginning there is a 22 m slide. Directly after this, the exit is on the left. After Nizzola, "the descent into hell" begins here. The difficulty arises from the fact that after rappelling into the narrow section in the water spray, you have to set up a handrail and the following 30 m rappel in the lower section leads into a chute (with full water pressure), from which you should stay out as far as possible (pendulum slide).
Despite its short length, the Ticinetto is one of the most attractive canyons in Ticino in terms of both sport and scenery. Water drainage with a small reservoir above the entry point. Please contact the power station operator (SES) before and after(!) the tour: Tel. 0041(0)917569301
With regard to the amount of water, also note the overflow from the reservoir! (in this respect, Nizzola is mistaken when he only refers to the pool after the sheet pile wall).
Ritorno (25 min):
traduzione alternativa
➜
Lingua originale
An der Wasserableitung rechts über die Eisenleiter hinaus, dann über den Bach nach links queren und unter dem großen Fallrohr beginnend den Fußweg hinauf zum Einstieg.
At the water diversion, exit to the right over the iron ladder, then cross the stream to the left and, starting under the large downspout, walk up the footpath to the entry.
Coordinate:
Inizio del canyon
46.4211°, 8.84706°
↓↑
DMS: 46° 25" 15.96', 8° 50" 49.42'
DM: 46° 25.266", 8° 50.824"
Google Maps
Svizzera Topografica
DMS: 46° 25" 15.96', 8° 50" 49.42'
DM: 46° 25.266", 8° 50.824"
Google Maps
Svizzera Topografica
Fine del canyon
46.4198°, 8.8503°
↓↑
DMS: 46° 25" 11.28', 8° 51" 1.08'
DM: 46° 25.188", 8° 51.018"
Google Maps
Svizzera Topografica
DMS: 46° 25" 11.28', 8° 51" 1.08'
DM: 46° 25.188", 8° 51.018"
Google Maps
Svizzera Topografica
Parcheggio Entrata e uscita
46.42156°, 8.84731°
↓↑
DMS: 46° 25" 17.62', 8° 50" 50.32'
DM: 46° 25.294", 8° 50.839"
Google Maps
Svizzera Topografica
DMS: 46° 25" 17.62', 8° 50" 50.32'
DM: 46° 25.294", 8° 50.839"
Google Maps
Svizzera Topografica
Letteratura:
Mappa
1:25000
Libro Canyoning
Simon Flower
Cicerone
2012
Northern Italy and Ticino
Libro Canyoning
Anna Nizzola / Luca Nizzola
2010
Libro Canyoning
Matthias Holzinger & Thomas Guigon
Pixartprinting.ch
2020
Info sul canyon Cwiki
Info sul canyon Descente
Info sul canyon Ropewiki
Info sul canyon Schlucht.ch
09.08.2024
Noah Vestering
⭐
★★★★★
📖
★★★
⚓
★★★
💧
Basso
Completato ✕
traduzione alternativa
➜
Lingua originale
Vandaag stond deze op de planning, Helaas staat er bij de instap een bord waarop specifiek canyoning verboden wordt.
Today this one was on the schedule, Unfortunately at the entrance there is a sign specifically forbidding canyoning.
04.04.2023
Daniel Sturm
⭐
★★★★★
📖
★★★
⚓
★★★
Completato ✕
traduzione alternativa
➜
Lingua originale
Koordinaten und Beschreibung angepasst.
Coordinates and description adjusted.
09.03.2023
System User
⭐
★★★★★
📖
★★★
⚓
★★★
nessuna traduzione disponibile
Daten importiert von https://canyon.carto.net/cwiki/bin/view/Canyons/TicinettoCanyon.html
Idrologia:
1 map
2 the reservoir
3 on the dam crest
4 View of the 1st part
5 Beam from the sheet pile w...
6 in the chute below the she...
7 Entry into this chute, vie...
8
9
10
11 Stand above the 25m slide
12 dito
13 Rudi stands at the start...
14
15 I prefer ropes
16 Partial slide
17 Stand above the R32
18 in the C30
19 at the foot of the C30
20 Handrail to the stand abo...
21 in the C30
22 dito
23 in the large basin below...
24
25 Review of C13 (front) and...
26
27
28
29 R4
30 Exit via water drainage