Romli

Romli Khola Ultimo aggiornamento: 04.03.2026 da Bubtore
Sottoregione: लमजुङ जिल्ला / Lamjung
Città: Karuwa
v6 a4 V
23h
8h
13h
2h
3200m
1500m
1700m
x
160m
1x60m, 2x75m, 1x100m
27
2000m
a piedi
Valutazione:
★★★★★
3 (3)
Info:
★★★
2 (1)
Belay:
★★★
1.3 (3)
Sintesi:
Two-day vertical creek in himalayan gneiss and granite, fantastic scenery, ideal as an acclimatization trip before the big lines, or as a back up plan for Dandunge.
ottobre - marzo
8-18 Ore
Est
Granito
4.00km²
Prima discesa: 03.02.2022 da J.Triboldi, B.Schumacher, O.Stos, J.Hudlestone, M.Schuh, G.Zakel, J.Normand, L.Rogissart
Sintesi:
Two-day vertical creek in himalayan gneiss and granite, fantastic scenery, ideal as an acclimatization trip before the big lines, or as a back up plan for Dandunge.
Accesso:
Jeep from Pokhara about 1,5 hours to the Karuwa village.
Avvicinamento (8 h):
From Karuwa (1350m) approach by the jungle sherpas path through an abandoned shelter hut 1800m elev. to the glacial secret lake of Pipar Karka (old sherpas hut 3295m) 1st bivouac here, from there descend down to the creek and in the first tributary (a lot of jungle chaos), continue down to the first slope abseil in 2943m.
Giro (13 h):
From Pipar Karka 1-2 hr climbing down in wild jungle chaos. It starts inconspicuously with short abseils and free descents at 2943m, R5, R8, R6, R3 and R25, a strong tributary from the left and starting serious abseil, full of wonderful abseils and very nice flow. This will bring us over four larger verticals C55, C35, C20, C15 to the main C160 Hungry Birds, (R25 + easy climbing - in the short verticals below c160m there are suitable place for 2nd bivouac, 2135m - wood for the fire), then a series of beautiful waterfalls C12, C6, C75, C10, C12, C15, R15, C65, S8, C10, C35 to the final section of great cascade C90 + C70. Drilling set + bolts necessary, important!!!
Ritorno (2 h):
Simple exit through the construction of the hydro project to the village of Karuwa, about two hours.

Coordinate:

Inizio del canyon
28.419722°, 83.969444°
DMS: 28° 25" 11', 83° 58" 10'

DM: 28° 25.183", 83° 58.167"

Google Maps
First abseil
31.01.2025 Bubtore ★★★★★ 📖 ★★★ ★★★ 💧 Normale Completato
Wie so üblich im Himalaya, alles sehr gross und hoch. Der Zwischenstand am 160m ist sehr cool, ein paar rassige 60m-80m Abseiler die man im Wasser machen kann, aber ansonsten leider kaum eingeschnittene Passagen.
As usual in the Himalayas, everything is very big and high. The intermediate belay at 160m is very cool, a few racy 60m-80m rappels that you can do in the water, but otherwise unfortunately hardly any incised passages.
31.01.2025 Olda Stos ★★★★★ 📖 ★★★ ★★★ 💧 Normale Completato
Normal flow A3, original bolts/anchors was OK
10.02.2022 Olda Stos ★★★★★ 📖 ★★★ ★★★ 💧 Normale Completato
First descent - 2022
Idrologia:
Catchment area is 4 km², exit is currently at the construction site of the hydro project.